Why You Must Exploit BIM for Unparalleled MEP Clash Coordination

Why You Must Exploit BIM for Unparalleled MEP Clash Coordination

As any AEC company can attest, MEP clash coordination services are a vital element of the BIM modeling process. Clash detection and coordination emerge from the fact that BIM modeling does not accommodate just a single model but multiple models are incorporated over time into a consolidated main model.

Clash detection and coordination are not novel concepts. Traditionally, these processes were undertaken while already on site. In terms of BIM, clash detection is taken care of at the initial design phase. This means that all buildability challenges get resolved at the get-go, without waiting for the last modifications during construction. You would save a considerable sum of money and time.  

Why are companies choosing BIM?

BIM, also called building information modeling, has proven to be invaluable for businesses in the AEC industry. Scores of builders, engineers, architects, and contractors are indebted to this system that makes their lives much easier.

Whether you are an architect or an engineer, you require a 360-degree view of construction models, and BIM provides this. BIM allows you to visualize the model minutely and tag possible clashes and correct them in the design stage. You would gain an accurate and precise project design. MEP clash coordination services also ensure that the multiple disciplines involved such as engineering, architectural and structural fields get to efficiently collaborate with others. You would avoid conflicts, wastage and installation problems.

Clash detection powered by BIM leads to the acceleration of construction projects by detecting interferences among multiple models at the initial design phase itself. It enables project managers and architects to avoid possibilities of multi-level modification of design that can lead to a decrease in final cost, wastage of material, and construction completion duration. Additionally, structural 3D modeling service allows you to shape your clients ideas into 3D structural models.

Applying MEP clash coordination services with BIM can bring out valuable advantages to both architects and engineers working on a project:

  • All through the model inspection phase, clash detection is carried out in Revit and Navisworks. It has the ability to decrease the amount of change orders in the course of a project resulting in lesser human-agent flaws, cutting back on money, resources and time for project managers, and companies.
  • Reports generated, in terms of 3D clash detection, offer comprehensive plotting of parts of the existing structure. This allows the engineers to render further design changes and enhancements in current structures which are then sent over to contractors.
  • Clash detection tools are vital for lowering design errors and deficiencies that are expensive during and after the project design conclusion.
  • BIM clash detection and coordination services deliver a platform for collaborative efforts among engineers, architects, builders and contractors to rectify errors at the get-go and ensure that the project design is accurate and precise.
  • Construction scheduling is made possible in real-time, by means of BIM coordination and clash detection services.
  • It allows several disciplines to work on a single platform and ensure that the model is synchronized to show changes carried out by all involved in the project.

It’s clear that MEP clash coordination services powered by BIM are gaining momentum and are leading to precise design and models and structures that are free of clashes.